Report defines the scope of the problem by listing conditions at all homeless shelter facilities and tracks progress made by the expanded repair program. Includes total number of inspections conducted, new problems found, and violations and other conditions resolved.
Privately owned public spaces reporting.
For each POP:
• Complaints received
• Enforcement actions taken (inspections, NOVs, OATH decisions, imposition of penalties)
• Whether DOB authorized closure (duration and reason for closure)
The Landmarks Preservation Commission designates as a NYC Landmark the AT&T Building ... an icon of the Manhattan skyline. The designation report outlines the history of the building.
Report defines the scope of the problem by listing conditions at all homeless shelter facilities and tracks progress made by the expanded repair program. Includes total number of inspections conducted, new problems found, and violations and other conditions resolved.
Local Law 7 of 2018 requires HPD to evaluate certain sales of select rent-regulated multiple dwellings for potential inclusion on the Speculation Watch List.
Report defines the scope of the problem by listing conditions at all homeless shelter facilities and tracks progress made by the expanded repair program. Includes total number of inspections conducted, new problems found, and violations and other conditions resolved.
An independent review by the National Academies of Sciences, Engineering and Medicine, strongly endorsed the Operations Support Tool (OST) for guiding the operation of New York City's drinking water supply.
Office of Tenant Advocate activity report, LL 161/2017 • # of complaints received by OTA and description of complaint • Average response time to complaints • Description of efforts to communicate with tenants • # of recommendations made to DOB commissioner
Local Law 1 of 2007 requires the Dept. of Citywide Administrative Services(“DCAS”) to assess all City-owned facilities with a peak electric demand of at least 500 kilowatts (“kW”) for the potential to accommodate clean on-site power generation technologies (Cogeneration and Distributed Generation).
Report defines the scope of the problem by listing conditions at all homeless shelter facilities and tracks progress made by the expanded repair program. Includes total number of inspections conducted, new problems found, and violations and other conditions resolved.
Reporting on education and outreach regarding single-occupant toilet room requirements
LL 190/2018
• Education and outreach (description and # of business owners reached)
• # of complaints
• # of violations issued
• Total penalties imposed
• Follow-up inspections