Report including 1. The types of utility-scale energy storage systems that were studied, as applied to various city buildings; 2. The city buildings where the installation of a utility-scale energy storage system may be appropriate, as determined by the department and the projected annual energy and other cost savings for each such system, both individually and in the aggregate; 3. The number of city buildings where the installation of a utility-scale energy storage system has been commenced by the department or other agency authorized by the commissioner; and 4. The number of city buildings where the installation of a utility-scale energy storage system has been completed by the department or other agency authorized by the commissioner, the type of such system installed on such building, and the annual energy and other cost savings associated with the installation and use of such systems.
For each such facility, such report shall include the number of deliveries, the provider of the goods delivered and the value of the goods delivered that have been diverted to off-hours deliveries and any measures taken to increase off-hour deliveries
Report shall include the number of deliveries, the provider of the goods delivered and the value of the goods delivered that have been diverted to off-hours deliveries and any measures taken to increase off-hour deliveries
Aggregate report on non-production of inmates for medical appointments and including an aggregate count of reasons for production refusal or walkout, if given, and the facility.
A report of alleged incidents of sexual abuse, sexual harassment and interventions against visitors by staff that occurred during the preceding six month period for which an investigation lasted longer than 90 days, with required information for each allegation of sexual abuse, sexual harassment and intervention.
A report of alleged incidents of sexual abuse and sexual harassment for which an investigation lasted longer than 90 days that occurred during the preceding six-month period