Revisions to the New York City Department of Transportation standard highway specifications 5/16/22. Section 2.10(Attachments) - Replace the revised section in Attachment 1.
Sheeting and Bracing revisions to the New York City of Department of Environmental Protection standard sewer and water specifications dated 8/8/22. Attachments - Section 40.05 (7 page.)
This Spotlight examines how the City’s actual General Fund revenues and expenditures compare to the projections in the budgets adopted in June of the previous year, and how this performance evolved over the past decade
NYC's economy, though quite complex and diverse, has been driven in large part by the securities industry (more colloquially, Wall Street) for the past half century. As a result, the city’s economic fortunes have been highly dependent on the ups and downs of the financial industry and markets
Specifications Concrete for bollard foundation and sidewalk pavement restoration and hollow pipe bollard cores must comply with the requirements of Section 3.05, Concrete, class B-32. Where the adjoining sidewalk is pigmented, the final cured concrete for pavement
The Specification Bulletin 22-006 provides information concerning Contractor's work method and modifications when performing contract work for the City of New York.
The Contractor shall provide, furnish and maintain a fully equipped field office for the exclusive use of and occupancy by the Department’s engineering personnel and/or Supervising Consultant and by the engineering personnel of private utilities when specified.
The Department of Design Construction is committed in supporting the growth of Minority and Women-owned Business Enterprises. The NYC Department of Design & Construction's compiles with LOCAL LAW 1 / NYC Administrative Code section 6-129 as amended.