The Contractor shall provide, furnish and maintain a fully equipped field office for the exclusive use of and occupancy by the Department’s engineering personnel and/or Supervising Consultant and by the engineering personnel of private utilities when specified.
Updates to Section 60.12.3.(J) of the 7/1/14 NYC DEP Standard Sewer and Water Specifications. The updates are for worker safety and to ensure square clean cuts when ductile iron pipe is cut in a trench.