Report on audit including the total number of audits conducted;2. The percentage of certifications of correction audited;3. The percentage of audited certifications of correction found to have been false; 4. For audited certifications of correction found to have been false, the total amount of civil
Report including (i) the number of complaints received disaggregated by building; (ii) the average time taken to respond to complaints; (iii) the number of monitored occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2; (iv) the number of ini
As required by New York City Administrative Code, Title 25, Section 318, report containing the February 2024 Staff Level Reports of the Landmarks Preservation Commission
Report including (i) the number of complaints received disaggregated by building; (ii) the average time taken to respond to complaints; (iii) the number of monitored occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2; (iv) the number of ini
As required by New York City Administrative Code, Title25, Section 318, report containing the January 2024Staff Level Reports of the Landmarks Preservation Commission
Report including (i) the number of complaints received disaggregated by building; (ii) the average time taken to respond to complaints; (iii) the number of monitored occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2; (iv) the number of ini
Report including (i) the number of complaints received disaggregated by building; (ii) the average time taken to respond to complaints; (iii) the number of monitored occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2; (iv) the number of init
Report including but not limited to: 1. the number of complaints received by the office and a description of such complaints; 2. the average time taken to respond to such complaints; 3. a description of efforts made to communicate with tenants; and 4. the number of recommendations made to the commis
Report on determinations of material false statement in any certificate, professional certification, form, signed statement, application, report or certification of the correction of a violation that is either submitted directly to the department or that is generated with the intent that the departm
Sheeting and Bracing revisions to the New York City of Department of Environmental Protection standard sewer and water specifications dated 8/8/22. Attachments - Section 40.05 (7 page.)