Sheeting and Bracing revisions to the New York City of Department of Environmental Protection standard sewer and water specifications dated 8/8/22. Attachments - Section 40.05 (7 page.)
An overview of the NYC’s sewer system and the performance metrics used to evaluate operations across the Department of Environmental Protection, from the work of field crews and frontline supervisors to senior management.
Biosolids are a product of the wastewater treatment process that, when treated to regulatory standards for beneficial reuse, are widely used to enhance soils and provide ecosystem benefits.
An overview of NYC’s sewer system and the city’s approach to inspection, cleaning, and repair, along with ways advanced analytics, software, and mapping tools can target problem areas and hydraulic modeling is guiding capital project designs.
As an enhancement and modification of the two-year cycle of surveying the City’s coastal waters under the Shoreline Survey Program, a Sentinel Monitoring Program was designed, with NYSDEC, to monitor specific sampling areas for fecal coliform (a raw sewage indicator) in water bodies throughout NYC.
In accordance with Section VIII of the State Pollutant Discharge Elimination System (SPDES) permits for the fourteen New York City municipal wastewater treatment plants, the New York City Department of Environmental Protection reports annually on its ongoing program.
In accordance with the CSO Order on Consent (DEC Case No. CO2-20110512-25, modification to DEC Case No. CO2-20000107-8), the New York City Department of Environmental Protection submits quarterly reports on its actions toward complying with the Order's milestones.
North River Wastewater Resource Recovery Facility’s (WRRF) Quarterly H2S Monitoring Report as required by Condition 32, Item 32.2 of the WRRF’s 6 NYCRR § 201 Air Title V Facility Permit Renewal 2, effective December 23, 2019.
North River Wastewater Resource Recovery Facility’s (WRRF) Continuous Opacity Monitoring (COM) report as required by Condition 34, Item
34.2 of the WRRF Part 201 Title V Air Facility Permit Renewal 2, effective December 23, 2019.