Under this item negotiations are needed with the railroad to obtain a permit to enter railroad property and comply with all relevant railroad work and financial requirements.
The NYC Department of Sanitation (DSNY) Borough Snow Plans, pursuant to the requirements of LL 28 of 2011, describe measures DSNY will take to fight winter weather, clear streets for safe transportation, and address issues of public safety related to snow and ice conditions in each borough.
THE BULLETIN EXPLAINS THE REVISIONS TO THE NEW YORK CITY DEPARTMENT OF ENVIRONMENTAL PROTECTION WATER MAIN STANDARD DRAWINGS. INFORMATION INCLUDED STATES THE PARTICULAR COMPONENTS OF THE WATERMAIN.
The Contractor must furnish an adequate number of competent personnel to control all traffic (vehicular, bicycle, micromobility, and pedestrian) when it is necessary to maintain a-way traffic in one lane of a two-way roadway, require positive temporary traffic control.
PAYMENT REQUISITIONS
Each payment requisition following the initial mobilization payment requisition must be consistent with the
previous requisitions and payments, as certified by the Engineer.
During the progress of the work and until the completion it is required to actively provide temporary protection shielding to prevent construction debris from entering
catch basins and inlets.
This Specification Bulletin (SB) is effective for projects; Reinforced concrete sewers must be constructed of the sizes and dimensions shown by the normal sections and special sections and to the lines and grades shown
This Specification Bulletin (SB) is effective for projects advertised on or after 8/19/2024. Updated reference to NYCDOT STANDARD HIGHWAY SPECIFICATIONS current edition.
This document contains information from the EEPC required by the City of New York related to the EEPC's collection, retention, and disclosure of identifying information and privacy protection practices.