The NYC Department of Sanitation (DSNY) Borough Snow Plans, pursuant to the requirements of LL 28 of 2011, describe measures DSNY will take to fight winter weather, clear streets for safe transportation, and address issues of public safety related to snow and ice conditions in each borough.
PAYMENT REQUISITIONS
Each payment requisition following the initial mobilization payment requisition must be consistent with the
previous requisitions and payments, as certified by the Engineer.
During the progress of the work and until the completion it is required to actively provide temporary protection shielding to prevent construction debris from entering
catch basins and inlets.
This Specification Bulletin (SB) is effective for projects; Reinforced concrete sewers must be constructed of the sizes and dimensions shown by the normal sections and special sections and to the lines and grades shown
This Specification Bulletin (SB) is effective for projects advertised on or after 8/19/2024. Updated reference to NYCDOT STANDARD HIGHWAY SPECIFICATIONS current edition.
This document contains information from the EEPC required by the City of New York related to the EEPC's collection, retention, and disclosure of identifying information and privacy protection practices.
This document contains information required by by the City of New York for agencies to submit comprehensive reports related to their collection, retention, and disclosure of identifying information and their privacy protection practices.
The FY 2025 Adopted Budget has $4.75 billion budgeted for Asylum Seekers. Assuming that the census remains relatively flat (compared to OMB’s higher projections), and using the target per diem of $335, the Comptroller’s Office projects that overall costs will be closer to $3.42 billion.
As required by New York City Administrative Code, Title 25, Section 318, report containing the June 2024 Staff Level Reports of the Landmarks Preservation Commission