Adding new Section 4.13 to the 7/1/2014 NYC DEP Standard Sewer and Water Specifications. This section provides new requirements for temporary stockpiles within the city, but not on the Right of Way. The new Section also includes the DSNY Interpretive Memorandum #2, 2/14/1995.
Revisions to the NYC DEP Standard Sewer and Water Specifications, updating the requirements for restoration of pavement surfaces after sewer and water main work.
Updates to the NYC DEP Standard Sewer and Water Specifications and the NYC DEP Standard Water Main Details to update requirements for installation of fire hydrants.
The Contractor shall provide, furnish and maintain a fully equipped field office for the exclusive use of and occupancy by the Department’s engineering personnel and/or Supervising Consultant and by the engineering personnel of private utilities when specified.
The Department of Design Construction is committed in supporting the growth of Minority and Women-owned Business Enterprises. The NYC Department of Design & Construction's compiles with LOCAL LAW 1 / NYC Administrative Code section 6-129 as amended.
The NYC DDC has developed the Specification Bulletin for the NYCDOT which includes Standard Highway Specification and updates on the Highway Specifications.
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION standard Sewer and Water Specifications for August 2022. Information includes specifications that are governed as well as provisions.
This bulletin consist information pertaining to furnishing and installing detectable warning surface as indicated on the plans or elsewhere. The sidewalk surface as specified in the Contract Drawings must be finished with a detectable warning surface as specified.