Report on the education and outreach conducted as required by section 28-103.32 including a description of how such outreach was conducted and the number of business owners reached through the outreach [...].
The report contains information on the number of accidents at construction sites, which are incidents where there has been an injury or fatality, occurring on a construction site (with or without work permit) or caused by construction activity on an adjoining site.
Report including (i) the number of complaints received disaggregated by building; (ii) the average time taken to respond to complaints; (iii) the number of monitored occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2; (iv) the number [...]
Report on audit including the total number of audits conducted;2. The percentage of certifications of correction audited;3. The percentage of audited certifications of correction found to have been false; 4. For audited certifications of correction found to have been false, the total amount of civil
This quarter, the Office of the Tenant Advocate (OTA) received 660 inquiries, 40 of which were referred to the Office of the Building Marshal (“OBM”) at the Department of Buildings, 15 to other DOB Enforcement Units and 49 to other city and state agencies. This total does not include the 319 complai
Report including but not limited to: 1. the number of complaints received by the office and a description of such complaints; 2. the average time taken to respond to such complaints; 3. a description of efforts made to communicate with tenants; and 4. the number of recommendations made to the commis
These reports contain information on the number of accidents at construction sites, which are incidents where there has been an injury or fatality, occurring on a construction site (with or without work permit) or caused by construction activity on an adjoining site.
These reports contain information on the number of accidents at construction sites, which are incidents where there has been an injury or fatality, occurring on a construction site (with or without work permit) or caused by construction activity on an adjoining site.
Report including but not limited to:1. the number of complaints received by the office and a description of such complaints; 2. the average time taken to respond to such complaints; 3. a description of efforts made to communicate with tenants; and 4. the number of recommendations made to the comm..
A report on the agency's efforts during the previous quarter to implement the plan adopted pursuant to paragraph nineteen (annual plan) of Section 815(a), including details of agency's efforts to implement equal employment practices, including statistical information regarding total employment[...]